Basement Remodeling Project
When I moved into my new house a couple of years ago my basement was finished but outdated and since it wasn't a space that I needed for living I pretty much ignored it and used it as storage. Last summer I went through the boxes I still hadn't unpacked since moving and purged more stuff (that felt great). I then painted over some awful wall paper and a pink bookshelf in preparation for my birthday party. After that I went back to nearly ignoring my basement, but the one thing I really wanted was a fully functioning 2nd bathroom. The basement has a bathroom but the shower didn't work so I decided in January that it was time to get someone to help me redo my bathroom. That is where my big basement remodeling project started. I don't have many pictures of the basement before I started remodeling but here are a couple from the demo process.
Chris & Michelle Small began emolition began in February. They took everything in the bedroom, big rec room, and a storage room down to the studs. They also took out the UGLY vanity and the non-working shower in the bathroom. After that we started working on putting my vision together in the basement. I had two egress windows installed and a doorway cut in the cinderblock so I could turn half of the rec room into a bedroom. Most of my job during this remodel was sanding and staining doors and trim and writing checks.
Eventhough it's not all done like the shower tile, floor trim and ceiling planks, things look pretty amazing in each room. I am excited to know that when I am all done and the rooms are furnished I will have a 4 bedroom, 2 bath house. $$$$$